No. | Nama Bangunan | Jumlah Lantai | Luas (m2) | Tinggi (m) | Tahun Didirikan | Kondisi |
---|---|---|---|---|---|---|
1 | R. Kelas, Lab. Komp, Perpustakaan, Kantor | 1 | 330 | 4 | 2014 | <30% |
2 | R. Kelas (Gedung B) | 1 | 90 | 4 | 2014 | <30% |
3 | R. Kelas (Gedung C) | 1 | 90 | 4 | 2014 | <30% |
4 | R. Kelas (Gedung D) | 1 | 90 | 4 | 2014 | <30% |
5 | R. Kelas (Gedung E) | 1 | 90 | 4 | 2018 | <30% |
6 | R. Lab Bengkel TKR (Gedung F) | 1 | 252 | 6,5 | 2018 | <30% |